Last week, the whole studio was getting very busy with everyone working really hard and staying late, me being one of them till about 8pm.
I was given quite a lot of garments to amend for it to be sold during PV (Premier Vision) and was also asked to create a pattern for printers to use for production. With all this going on within the week, you could tell that the boss was getting quite stressed out!
However, whilst everyone was busy, clients were coming in and out of the studio and into the office where meetings took place where they could buy the designs/prints; one of whom was the designer for New Look.
This week whilst the boss is away, things seem more calm without Chris (the boss) running around shouting at people and ordering them to do things. This doesn't mean that we can slack, we are all still working hard on designs and i still stay a little longer than my usual hours to try and complete my tasks for the day.
Its my first time being told to make a jacket from scratch so this i found very challenging, as i had to create my own blocks/patterns from paper and the help from a mannequin! From start to finish i have taken a total of two days which i am happy about as i did find it tricky to sew at first. I look forward in my next challenge =)
Tuesday, 20 September 2011
Friday, 2 September 2011
A third of the way there!
It's almost 2 months since i started my 2nd placement at The Collection Design Studio and it's going great!
During the first month, one of the designers was away for the week, so with the fabric manipulation samples i had made, the designer drew a picture of a top of where she would like the manipulation to be placed, and i was left to make the whole top from scratch; where no pattern cutting was needed.
Here's an example of one of the four tops which i had to make:
To this point during my placement, everything is going well.
During the first month, one of the designers was away for the week, so with the fabric manipulation samples i had made, the designer drew a picture of a top of where she would like the manipulation to be placed, and i was left to make the whole top from scratch; where no pattern cutting was needed.
Here's an example of one of the four tops which i had to make:
| sample of fabric manipulation |
| sketch of design |
(For Copyright reasons i cannot upload a picture of the finished garment)
I have had a lot more responsibility and the jobs that I do now are quite independent. The past couple weeks Chris (The owner) had given me 6 skirts to make, each of them being full length skirts which also had a lot of volume in them and detailing such as drawstrings.
In theory, he would like a garment a day to be made, realistically speaking at my standard it was quite hard to achieve this. At the end of these two weeks, I have averaged it out and it takes me about 1.5/2 days to make a skirt. This I think is quite good as I haven't pattern cut properly since the end of last December.
To this point during my placement, everything is going well.
Monday, 25 July 2011
An end of a good job, to a start of a great job!
How quick time goes by! My 6 month internship at Jaeger has finished a couple weeks ago. The last couple days putting together a sample sale for staff as they have so much samples...getting a good bargain before I leave! =P
Along with setting up for the sample sale, I also had the role of managing the sample sale and working on the tills in writing out the receipts and taking in checks (check only sample sale).
Leaving Jaeger was quite sad, everyone there is so nice and i have made some really good friends. Some colleagues from my leaving drinks do.
A new beginning.... The Collection. A copyright design company, designing garments to be sold around the world to designers and retail brands.
These samples were just to get me into the hang of fabric manipulation and getting ideas into my head.
So far it has been quite good as i have already sewn together a skirt, top and dress, also amending four garments which is going to sell in Italy, New York and other places. People in the company are nice and friendly with about 4 print designers and 3 other designers.
I am now into my third week and i am getting more responsibility on where to place embroidery on the fabric and amending garments. At the moment, it works out that the designer i assist drapes the fabric and I sew the garment together and add the embroidery before/after it has been draped and sewn. A good process and team work, which works quite well between us two.
Chris the owner of the company has seen some of the work that i have done and he likes the things that i have created which is good news.
I hope that the following weeks and months will be even more exciting!
| Half of the sample sale room. Small and very hot! Good job there's air-con. |
| Accessories for sample sale |
Leaving Jaeger was quite sad, everyone there is so nice and i have made some really good friends. Some colleagues from my leaving drinks do.
| Steph, started as an intern and now working as menswear buyer's admin assisstant |
| Grace, Buyer's admin assistant on Women's Jaeger London |
| Jonathan, head buyer's assistant, Emma, Merchandiser of accessories |
![]() |
| Jen, Buyer's admin assistant for accessories |
| Merchandisers for all stock |
| The little sewing room with many many buttons and ribbons! |
At The Collection, I am an assistant designer to one of the main designers in the company, therefore i work very closely to her and help her out in her designs.
| Starting off with some fabric manipulation using only cording |
These samples were just to get me into the hang of fabric manipulation and getting ideas into my head.
So far it has been quite good as i have already sewn together a skirt, top and dress, also amending four garments which is going to sell in Italy, New York and other places. People in the company are nice and friendly with about 4 print designers and 3 other designers.
I am now into my third week and i am getting more responsibility on where to place embroidery on the fabric and amending garments. At the moment, it works out that the designer i assist drapes the fabric and I sew the garment together and add the embroidery before/after it has been draped and sewn. A good process and team work, which works quite well between us two.
Chris the owner of the company has seen some of the work that i have done and he likes the things that i have created which is good news.
I hope that the following weeks and months will be even more exciting!
Thursday, 2 June 2011
Preparation for press day
Press day is a huge thing for Jaeger, as it is a day when editors from big named magazines come to store to look at the A/W '11 collections and see what they would like for their editorials.
| Jaeger London labels for samples which i had to prepare for. |
| Collating samples together for press day |
| Samples.... |
Saturday, 26 March 2011
Samples, samples and more samples...
It's the last week for the wholesale department to sell A/W '11 garments internationally, where they have been selling for more than a month. Having a big part in this as I had to track the wholesale samples for Jaeger London garments in order for them to sell internationally.
Show room 1:
Show room 2:
Extra samples:
An example of the boards which i have put together for our buying team to work from for A/W '11. These include flat drawings, with price, fabric composition, fabric swatches and group name:
Womenswear showroom used for buying teams. As you can see there are a lot of samples consisting of A/W'11 garments, both including cancelled and bought items which needed to be sorted out. In the picture is Natalie from the fashion retail academy, interning for 3 weeks only. She helped me lots with putting away and getting samples for meetings. This was a nightmare to sort out as the cancelled items and bought items were mixed up, therefore going through each of the garments and checking if they were on the range plan.
I have post! When receiving this, there was a lot of excitement as i started to get post from the suppliers which I had requested for.
A/W '10 sample clear up. As there are many samples kept in the back room, we needed to clear up old samples in order to put in the new. With lots of jobs going on throughout the day, me, Briony and Rhona did some last minute packing before the day was to finish and for the van to come and collect the samples early next morning. In total there must have been at least 20 boxes, along with 3 packed rails of clothing, which were to be sent to the Regent St store and put away in the cage for the next sample happening in May.
There's space!!!! -->
Lunch time with the interns =) Such a beautiful day!
Sunday, 27 February 2011
Busy Bee..
Hi everyone!! Hope you are well ^_^
How a month has gone by so quick!! So many things have happened this month, explaining why I haven't posted in a few weeks...
So what has happened??
How a month has gone by so quick!! So many things have happened this month, explaining why I haven't posted in a few weeks...
So what has happened??
- Creating files for A/W '11 & S/S '12 collections, which store in all spec sheets for the collections, approvals/rejections of lab dips, zips, buttons, everything which makes up a garment from all different sorts of suppliers
- Visiting one of the suppliers for Jaeger to drop off a sample. (This was exciting as I didn't know what to expect! And the owner said "Kung hei fat choi" to me (happy chinese new year) which made me smile =D
- Tidying the stockroom and shifting the old with the new! (AW '10 with SS '11)
| Rail emptied into boxes..SPACE!!! =P |
| Separating t-shirts, jersey and knit wear, and blouses, also trying to colour co-ordinate to make life easier! |
- Working with Jaeger's stylist and Chief designer, and taking photographs in a photo shoot setting for Jaeger's A/W '11 collection, as they did not know what garments to put down the catwalk which was happening in 3 days!!
![]() |
| My backstage pass |
![]() |
| Make up sponsored by Mac and hair by Toni & Guy |
| Models getting ready |
| Me and one of the many stunning models! |
![]() |
| A couple of the interns at Jaeger =) |
![]() |
| Jamelia - opening and closing the show for Jaeger, wearing one of the garments! |
- Line manager made me "senior intern" =) as a new intern had started already for a week, with two weeks left, i have been telling her how to do certain things, and helping me out with certain jobs as well. This is quite difficult to me as most of the jobs that needed doing I had already completed. Therefore i didn't have many jobs for the new intern, and struggling to sometimes get things to do for myself! Its competition!!
- Finally, I have been taught how to update prices to the range plan, sending updated purchase orders to suppliers, along with inputting new spec information for S/S '12 collection details into the design sheets onto the system, which goes into the critical path also.
Next week will be interesting as one of the girls has come back from holiday, which will possibly mean less jobs to do, as i was in charge for the week tracking down the proto, white and gold seals ready to be fitted, along with wholesale samples for A/W '11 which have been put into the showrooms for selling by the international team.
Let the week begin......
xXx
Sunday, 23 January 2011
Spreadsheets....
Yes! Spreadsheets! It's the one thing I cannot live without right now at the office... It's all spreadsheets, we live and eat on them ^_^
Here's one of the many spreadsheets which i have created with supplier replies to emails which i have sent out. Also to check against for wholesale samples being delivered to the head office and into the show room ready for conferences and meetings, which have happened within the last week, a very hectic week but at times also quite quiet and nothing to do...
Done with spreadsheets, now with the spec sheets! =.= A lot of photocopying was involved along with going on one of their databases and printing out spec sheets for folders to be created for their A/W '11 collections as suppliers have started to send approval samples for zips/fabric/buttons..everything. *A very important job*